top of page

Applications, because
"nothing else matters".


Extrusion Die Cleaning Guide: Technical Analysis (Step A).
In aluminum extrusion, the press isn't your most important asset: your dies are. In this Step A analysis, we break down why neglecting die care is an EBITDA loss and how a Lean approach to cleaning recovers your margins.

Silvio Ruiu
Jan 12 min read


True Cost of Aluminum Extrusion Die Maintenance: 10 Years TCO. Step D.
Moving beyond CAPEX to understand the real financial impact of die cleaning. A quantitative 10-year TCO roadmap based on on-field data, comparing manual vs. automated systems through the lens of LEAN consistency and cumulative operational spend.

Silvio Ruiu
Dec 31, 20252 min read


Die Shop: the Brain of the Extrusion Plant. Step C.
Optimize your Die Shop KPIs: throughput and process consistency. Discover why automated dry blastwheel technology outperforms wet slurry and air systems by ensuring deep surface activation, zero flash rust, and lean single-piece flow for H13 steel dies.

Silvio Ruiu
Dec 31, 20256 min read


Die Shop: Analysis and EBITDA Impact. Step B.
The Die Shop is the smallest gear in the extrusion mechanism, but it’s where a small deviation impacts most on EBITDA. Suggestion: stay seated.

Silvio Ruiu
Dec 30, 20253 min read
bottom of page