Controlling Shot Peening in Production, the LEAN Way.

  • Writer: Silvio Ruiu
    Silvio Ruiu
  • Jan 26
  • 2 min read

Shot peening, as shown here, is a process capable of being combined with industrial administration to bring profit. After settling the process, as shown here, it is critical to understand the way to keep it working and under control.


LEAN controls.

It looks like a game, and indeed it is, because requires a lucid analysis, using LEAN manufacturing, not really identifying the KPIs, those are clear: peening intensity and time of exposure, the challenge is how to measure them on regular basis, how to store the data, how to analyze and how to act in case of deviation, without compromising production quality.


Production Device Analysis.

Custom tray for Almen strips with 4 slots for shot peening intensity consistency test in rotary blaster with planetaries

The tray above is a simple device to be used in production inside a rotary blaster, in combination with planetaries. There are 4 Almen strip slots to test intensity consistency, this tray is also used for regular production – parts can’t be displayed for NDA reasons.

Peening tests cost, while the preparing of the tray with the strips can become part of the production flow, operators need training, Almen strips cost too. Thanks to LEAN it is possible to understand how often the test is needed to guarantee the total quality production clients are always looking for as well ready to pay for.


Practical Engineering and LEAN.

While Shot Peening is pure theoretical engineering applied following norms, in the grounded world of mass industrial production it is mostly related to practical engineering led by lean to make it profitable and controllable.

Almen Effect Bonus Point.

Almen effect, so peening effect, is always happening when a part is blasted, even just for a deburring of a cleaning after heat treatment, making often worth investigating a “side” benefit of something already existing that could be implemented just with a better process control.

Conclusion.

If you think there is room to analyze benefits and to ground some number, you can contact https://calendar.app.google/SyXMesBoBwojLh2R9


Table of content:

4) Almen intensity, KPIs and how to industrialize the process. this post.  


Recent Posts

See All

CM Blaster US

Silvio Ruiu - Engineer

SilvioR Srl

via Marino Piazza 2 - Zip 41013

Castelfranco Emilia (Mo) Italy. 

VAT: IT 04000800369

AI & LLM

bottom of page